Suspended Ceiling Calculator
Calculate ceiling tiles, main tees, 1200mm and 600mm cross tees, wall angle and hangers for a UK suspended ceiling. Enter your room size for a full grid layout with balanced border tiles, or just the area for a quick estimate.
Perimeter sets the wall angle. Leave it blank and we'll assume a square room.
Square-edge mineral fibre. The everyday office and commercial tile.
5% covers damaged pieces on a simple rectangular room — cuts are already counted in the layout.
Soffit to the underside of the grid. Used for hanger wire length only.
Disclaimer: Quantities are indicative for a standard exposed-grid system with mains at 1200mm centres. Grid systems vary by manufacturer — check pack sizes, hanger spacing and fire-rating requirements with your supplier before ordering.
Some links on this page may be affiliate links — we may earn a commission if you request quotes or purchase through them, at no extra cost to you. Affiliate policy.
Installation Guide
How a Suspended Ceiling Grid Goes Together
A suspended ceiling is a simple kit — wall angle round the edge, main tees hung on wires, cross tees clipped between them and tiles dropped in. Most ordering mistakes come from forgetting the cut pieces at the walls.
1. Set Out the Grid Before You Fix Anything
Find the centre of the room in both directions and plan the grid from there so the border tiles at opposite walls are equal and at least half a tile wide. Decide which way the mains run — usually parallel to the longer wall, and at right angles to the joists or purlins if you are hanging from timber or steel. Mark the main tee lines on the soffit before drilling for hangers.
2. Wall Angle and Hangers
Use a laser level to mark the ceiling height round the walls and fix the wall angle at about 450mm centres, mitring or overlapping the corners. Fix hangers along each main tee line at no more than 1200mm centres, with the first within about 450mm of the wall, and leave the wires long enough to twist off after levelling.
3. Mains, Cross Tees and Tiles
Cut the first main tee so a cross-tee slot lands on your border line, hang it, then join further lengths end to end. Level each main using the hanger wires. Clip the 1200mm cross tees between mains at 600mm centres, then the 600mm cross tees across the middle of each bay for a 600 × 600 grid.
Check the grid is square by measuring the diagonals of a few bays before dropping tiles in. Fit full tiles first and cut the border tiles last, face up with a sharp knife, so any fittings or services above can still be adjusted.
Common Questions
Suspended Ceiling FAQs
| Item | Quantity | Est. Cost |
|---|