Warm Deck PIR Thickness Calculator

Flat Roof Insulation Calculator

Work out how thick your PIR needs to be for a flat roof warm deck to meet Building Regulations, then get board, vapour control layer and fixing quantities for EPDM or GRP — with 2026 UK pricing.

Last reviewed 5 November 2026
England, Wales & Scotland targets
EPDM or GRP
Height-limited roofs
2026 UK Pricing
Rule of thumb: a flat roof warm deck needs about 150mm of PIR for a new roof or extension in England (0.15 W/m²K), or 140mm when re-roofing an existing roof (0.16 W/m²K).
Roof Details
Choose your target and enter the roof size

New roof or extension in England: 0.15 W/m²K (Approved Document L 2021, Table 4.2).

GRP adds an 18mm OSB3 carrier board over the PIR. Build-up: deck → vapour control layer → PIR → covering.

Tapered timber firrings fixed along the top of each joist. The deck, VCL and PIR then follow the slope at an even thickness.

Firrings sit along the joists, so the fall runs the same way the joists span — towards the gutter.

m
m
mm

Only if a door threshold, window sill or upstand limits how high the roof can go. Upstands should finish at least 150mm above the finished roof surface.

Flat Roof Warm Deck
Fill in the details, then press Calculate
Roof area
—
PIR thickness
—
for your target
PIR boards
—
2400×1200mm
Est. U-value
—
against your target
Choose your target, covering and fall, enter the roof size, then press Calculate. Results then update as you change options.

Warm Deck Guide

Flat Roof Insulation Thickness and Building Regs

How much PIR a warm deck flat roof needs, what U-value Building Control expects, and how the build-up goes together.

PIR Thickness by Building Regs Target

Warm deck, foil-faced PIR λ 0.022, EPDM covering — stock board sizes
SituationTargetMin. PIROrderEst. U-value
Re-roofing / renovating (England & Wales)0.16134mm140mm0.154
New roof or extension — England0.15144mm150mm0.145
New roof or extension — Wales0.13169mm90 + 80mm0.129
New roof, extension or re-roof — Scotland0.12184mm110 + 75mm0.119

U-value by PIR Thickness

Warm deck on 18mm deck with plasterboard ceiling · W/m²K
PIR thicknessEPDM / single-plyGRP on 18mm OSB3
100mm0.2100.204
120mm0.1780.174
140mm0.1540.151
150mm0.1450.142
170mm (2 layers)0.1290.127
180mm (2 layers)0.1220.120
200mm (2 layers)0.1110.110

Worked Example — 4m × 3m Extension in England

Target 0.15 W/m²K with EPDM. The rest of the build-up (ceiling, deck and surface resistances) adds R ≈ 0.34 m²K/W, and mechanical fixings add about 0.005 W/m²K, so the PIR needs R ≈ 1/(0.15 − 0.005) − 0.34 ≈ 6.56 m²K/W. At λ 0.022 that is 6.56 × 0.022 ≈ 144mm, so order 150mm boards — giving about 0.145 W/m²K.

Quantities: 12 m² + 5% wastage = 12.6 m² ÷ 2.88 m² per board = 5 boards of 150mm PIR, 1 roll of VCL, and about 30 fixings at least 175mm long.

The Warm Deck Build-Up

From the inside out: ceiling → joists → deck → vapour control layer → PIR → covering. All the insulation sits above the deck, so the structure stays warm and the roof void does not need ventilating — unlike a cold deck, where insulation between the joists needs a 50mm ventilated gap above it.

Falls: on most extensions and garages the fall is built into the structure with tapered firrings on top of the joists, so the PIR goes on at an even thickness and follows the slope — which is what this calculator assumes. Design at 1:40 so the finished roof never drops below the 1:80 minimum. On larger roofs, tapered PIR can form the fall on a level deck instead, with the layout designed by the supplier.

Lay PIR tight-butted with joints staggered. Above about 150mm use two layers with the joints offset, which stops heat escaping straight through the gaps. Tape the VCL laps and turn it up at every upstand so it can be sealed to the waterproofing.

Building Regulations — England, Wales and Scotland

England: a new roof or extension needs 0.15 W/m²K (Approved Document L 2021, Table 4.2). When renovating a roof that is currently worse than 0.35 W/m²K, upgrade it to 0.16 W/m²K (Table 4.3). Replacing the covering on more than half of a flat roof counts as renovation. A lesser standard may be accepted where upstand heights or the structure make the target impractical (Table 4.3, note 4).

Wales has its own Approved Document L (2022 edition), with 0.13 W/m²K for new roof elements. Scotland uses the Domestic Technical Handbook (June 2023 edition), Table 6.2: 0.12 W/m²K for new roofs, extensions and conversions. When an existing roof is rebuilt or re-roofed, 0.12 should be met as far as reasonably practicable, and the roof should achieve at least 0.35 W/m²K. New 2026 editions of Approved Document L take effect in England and Wales in March 2027.

EPDM vs GRP over PIR

EPDM and single-ply membranes can be bonded straight to PIR with a compatible facer, using the membrane manufacturer's approved adhesive. GRP needs a rigid substrate, so an 18mm OSB3 carrier board goes over the PIR and is fixed through it into the deck — which adds height and needs longer fixings.

Either way, the warm deck raises the roof level by the full insulation depth. Check door thresholds, window sills and wall upstands before you start — upstands should finish at least 150mm above the finished roof surface.

Common Questions

Flat Roof Insulation FAQs

For a warm deck with foil-faced PIR (λ 0.022 W/mK), about 150mm achieves 0.15 W/m²K — the Building Regulations limit for a new roof or extension in England. 140mm achieves 0.16 W/m²K, the standard when renovating an existing flat roof. Wales (0.13) needs about 170mm and Scotland (0.12) about 185mm, laid as two layers with staggered joints. Confirm with a manufacturer U-value calculation.
In England a new flat roof or extension needs 0.15 W/m²K (Approved Document L 2021, Table 4.2). A renovated roof that is currently worse than 0.35 W/m²K should be upgraded to 0.16 W/m²K (Table 4.3). Wales uses 0.13 W/m²K for new elements. Scotland's Technical Handbook (June 2023, Table 6.2) uses 0.12 W/m²K for new roofs, extensions and conversions — and when re-roofing, 0.12 as far as reasonably practicable and never worse than 0.35. Check your exact target with Building Control or your verifier.
Usually, yes. Replacing the covering on more than half of a flat roof counts as renovating a thermal element, so Building Regulations expect it to be upgraded — to 0.16 W/m²K in England and Wales, or towards 0.12 W/m²K in Scotland — where that is technically and economically feasible. A lesser standard may be accepted where upstand heights or the structure make it impractical, so agree it with Building Control before you start.
A warm deck puts all the insulation above the structural deck: deck, vapour control layer, rigid PIR boards, then the waterproof covering. The deck and joists stay warm, so there is no need for ventilation, and the risk of condensation in the roof void is far lower than with a cold deck where insulation sits between the joists.
Yes, if the PIR has a compatible facer and the adhesive system is approved by the membrane manufacturer — many fully bonded EPDM systems are designed for this. Otherwise lay a carrier board over the PIR first. GRP always needs a rigid substrate, usually 18mm OSB3, because it cannot be laid directly onto insulation.
A flat roof needs a finished fall of at least 1:80 (12.5mm per metre) so water drains without ponding. Design for 1:40 (25mm per metre) to allow for deflection and building tolerances. On an extension or garage the fall is usually formed with tapered timber firrings on top of the joists — a 3m fall at 1:40 needs firrings about 10mm deep at the low end and 85mm at the high end.
As a rule of thumb, around 6 fixings per 2400×1200mm PIR board in the main field of the roof, or 8 per OSB sheet over a GRP build-up. Edges and corners need more because wind uplift is higher there. The fixing must be long enough to pass through the full build-up and at least 25mm into the deck — get a wind-load calculation for the exact number.
Yes. The vapour control layer goes on the deck under the insulation and stops warm, moist air from the room reaching the cold side of the build-up, where it could condense. Lap the joints, seal them, and turn the VCL up at upstands so it can be sealed to the waterproofing.
PIR
—
Boards
—
U-value
—
Est. Cost
—